Road & Bridge
Hours of Operation

Summer: 7 a.m. – 4:00 p.m. Monday through Thursday
Winter: 7 a.m. – 4:00 p.m. 7 days per week
Winter Schedule begins in early December or when weather permits.
Summer Schedule begins in early April or when weather permits.
As of Feb 02, 2026 Boundary County Road and Bridge have Begun closing Boundary County Roads to laden loads.
About
The Boundary County Road and Bridge Department maintains over 355 miles of public roadway and 40 bridges in Boundary County. Of this, 150+ miles are hard surfaced (paved) and the remainder are graveled. By comparison, there are 78 miles of road maintained by the Idaho Department of Transportation, including US 95, Highway 1 and US 2.
Our maintenance equipment travels up to forty miles on state highways per round trip to access many segments of our county road system. Sand trucks often travel over 200 state highway miles per day to service county roads for winter maintenance. Each time our graders go out to do routine maintenance, they are each faced with approximately 45 miles of road to cut and refill and must make an average of six passes to complete the work, traveling over 300 miles at very low speed. Optimal grading conditions are during the drying period after a rainfall, when the new surface can be compacted. Grading during dry or wet periods usually results in repairs with a short life expectancy, just one of many of the challenges faced by the department in maintaining a large are with limited resources.
Projects
The Road and Bridge Department appreciates your cooperation during
road construction projects. Please drive safely through construction areas.
If you have any questions, please contact the Office at (208) 267-3838
Please keep checking back for new projects or updates.
Thank You!!
Contact
73 Sunrise RD
P.O. Box 1418
Bonners Ferry, ID 83805
bbarton@boundarycountyid.org
aryals@boundarycountyid.org
(208) 267-3838
Downloads
| Name | Department | Document Type |
|---|---|---|
| Road And Bridge Private Road Sign Application | Road & Bridge | Form |
| Resolution 99-7 Snow Removal and Sanding Policy | Road & Bridge | Ordinance/Resolution |
| Winter Letter 2025 PDF | Road & Bridge | Letter |
| Sight Triangle | Approach Permits, Road & Bridge | Advisory |
| Approach Drawings | Approach Permits, Road & Bridge | Advisory |
| Approach for private roads doc with disclaimer | Approach Permits, Road & Bridge | Form |
| Fillalble Road Access Application 7-2022 | Approach Permits, Road & Bridge | Form |
| Road Standards Manual Ordinance 2020-2 | Approach Permits, Road & Bridge | Ordinance/Resolution |
| Schoolhouse Road plan options | Road & Bridge, Road Projects | Advisory, Map |
| BCRoadClosures Updated | Road & Bridge, Road Closures | Advisory |
| Resolution 2005-29 Adoption of County Road Names | Road & Bridge | Ordinance/Resolution |